COLOPLAST – Gebäude CHM VI. Nyírbátor

By order of Kész Zrt. we produced and installed the building technologies for the production hall and office buildings for the danish company Coloplast in Nyírbátor. Coloplast operates in the field of production of specific medical devices and therefore requires high qualit standards.
Project Description
For the building CHM VI we produced 20 ventilation units in our production with 36.000 m³/h as the highest air volume flow. A clean room system was obliged by the client to meet the cleanleness requirements for the production.
Project Details
- Client: Coloplast
- Date: 2018
- Category: Ventilation + Sanitary system
- Website: impreza-landing.us-themes.com
Installation Facts
- 20 ventilation units up to 36.000 m³/h
- ventilation units equipped with specific air dryer, ducts and ventilation elements
- clean room system with six specific cooling-dryer.
- cooling with two free-cooling-ventilation units with a power of 33.000 m³/h each






