The Dorog-Project

In 2018 our partner Taikisha Europe Ltd – Hungarian Branch subcontracted us for the complete renovation of the building technologies of Building “D” of the GMD company in Dorog. To meet the requirements we produced and installed three ventilation units with a power of 44.000 m³/h with integrated gas-fired condensing boiler. Additional for the offices a 6.000 m³/h ventilation unit extended with a DX-cooling, 18 rooftop-fan and a close control air conditioner were installed for the offices. For the service water supply we implemented a water tank with a volume of 500 l. Three cooling towers with a power of 1.667 kW each were necessary to ensure the cooling for the tools according to the Lubricant-system.
Project Description
The installation was made with an ongoing production and had to be completed within two months.
Project Details
- Client: GMD-Group
- Date: 2018
- Category: HVAC – Heating Ventilation Airconditioning
- Website: impreza-landing.us-themes.com
Installation Facts
- Ventilation system with 140.000 m³/h
- Cooling system with 5.000 kW including a DRC system:
- complete heating and sanitary systems
- water fire fighting- and sewage system
- compressor and compressed air system for the production machinery
- gas-powered thermic-fans